This can take 48-72 hours depending on the mattress size, the temperature of the water used to fill the mattress, and the temperature inside the room. Process can be sped up by circulating the water and adding adequate covering. Make sure the dial is turned to full power position (dial setting 7) initially, but do not force the dial to spin past setting number 7 as this will break the dial and cause operating failure.